Ensure floor has been properly swept and cleaned before application, making sure that any oil, grease and old polish has been removed. Rinse well with water and allow to dry thoroughly. Mop or apply a thin film of product onto floor. Allow 30 minutes to dry. Apply a second thin coat and allow to dry. DO NOT ALLOW TO FREEZE |